Skip to content
STELIX / Platform

Construction operations, connected from source record to controlled proof.

Every operational surface, connected.

Four component studies show how Stelix turns separate construction registers into one coherent operating system.

01Operating grid

See the whole operation without losing the detail.

A balanced capability grid keeps project, safety, quality and workforce records visually equal while preserving the relationships between them.

Connected

Project control

Keep plans, programme, documents and commercial decisions attached to the project record.

  • Projects
  • Plans
  • Programme
Controlled

Safety in the work

Put permits, SWMS and corrective actions beside the activity they protect.

  • SWMS
  • Permits
  • Actions
Traceable

Quality evidence

Carry inspections, hold points, photos and sign-off through to close-out.

  • ITPs
  • Photos
  • Handover
Global

Workforce readiness

Use the same contractor, competency and training record across every project.

  • Contractors
  • Tickets
  • Training
02Control cards

Move from context to action to insight.

A second bento system gives each control surface room to explain the next useful move.

Connected context

See the project, people and programme around the source record.

Controlled review

Place the next decision with the accountable person and retain the outcome.

Operational insight

Turn linked records into a clear, reviewable operating picture.

04Record progression

Watch one record move through the system.

The animated stack shows how field capture becomes linked control and then controlled proof without changing the source.

FIELD RECORDCapture the work oncePhotos, dockets and site records begin at the source.
LINKED CONTROLKeep context attachedProjects, people, actions and evidence stay connected.
CONTROLLED PROOFReport with confidenceStatus, review and sign-off travel with the record.